Applied and Natural Science Foundation
Its publication:
Journal of Applied and Natural Science
An International Journal | Print ISSN: 0974-9411 | Online ISSN: 2231-5209
NAAS RATING 5.08
Sign up for free registration!
Already registered Log in
*Email Id  
*Password
Submit
[Forgot Password]
         
Abstract
Journal of Applied and Natural Science 5 (2): 475-481(2013)
Removal of COD and BOD from biologically treated municipal wastewater by electrochemical treatment.
Arun Kumar Sharma* and A. K. Chopra
Department of Zoology and Environmental Sciences, Gurukula Kangri University, Haridwar-249404 (Uttarakhand), INDIA
*Corresponding author. E-mail: asharma.env@gmail.com
Abstract : The present investigation observed the effect of current density (CD), operating time (OT), inter electrode distance (IED), electrode area (EA), initial pH and settling time (ST) using Fe-Fe electrode combination on the removal of chemical oxygen demand (COD) and biochemical oxygen demand (BOD) from biologically treated municipal wastewater (BTMW) of Sewage Treatment Plant (STP). The maximum removal of COD (92.35%) from BTMW was found with the optimum operating conditions of CD (2.82 A/m2), OT (40 mins.), IED (0.5 cm), EA (160 cm2), initial pH (7.5) and ST (60 min.), while the maximum removal of BOD (84.88%) was found with the ST (30 min.) at the same operating conditions. There was no need of pH adjustment of the BTMW during ET as the optimal removal efficiency was close to the pH of 7.5. Under optimal operating conditions, the operating cost was found to be 54.29 Rs./m3 / 1.08 US$/m3 in terms of the electrode consumption (78.48 x 10-5 kg Al/m3 ) and energy consumption (108.48 Kwh/m3).

Keywords : Biologically treated municipal wastewater, Current density, BOD, COD, Electrochemical treatment, Electrode consumption, Energy consumption.
Back
Bookmark and Share
Home | Admin Panel | Sitemap | Feedback | FAQ
© Copyright 2009-2016. All Rights Reserved. Designed & Maintained by www.apvtechnologies.com